Connect Smart Sprint Planner with Dokaai
Bring Smart Sprint Planner into your notification workflows.
Connect through n8n to use supported Dokaai actions alongside your existing tools.
About Smart Sprint Planner
Sprint and role items, history, capacity, absences, releases and planner permissions through the YouTrack REST. Write to one project sequentially; re-read the data after a series of writes.
What you can automate
Use n8n to connect Smart Sprint Planner events to Dokaai actions. Available events and fields depend on the app.
Workflow ideas
Get project overview in Smart Sprint Planner Send a Dokaai notification
Choose a notification handler and map the required fields in n8n.
Get many projects in Smart Sprint Planner Send a Dokaai notification
Choose a notification handler and map the required fields in n8n.
Get planner status in project in Smart Sprint Planner Send a Dokaai notification
Choose a notification handler and map the required fields in n8n.
These are workflow ideas, not prebuilt templates. Required data and configuration vary by trigger.
Smart Sprint Planner operations on n8n
Explore the triggers, actions, and searches available for Smart Sprint Planner in n8n. Availability and required fields depend on your account.
Actions
26Tasks your workflow can perform.
Get project overview
Planner version, whether it is configured, active roles, the working sprint with issue counts per role, the sprint creation lock and the release count
Get many projects
YouTrack projects visible to the token, marked with whether the planner is attached
Get planner status in project
Whether the planner is attached to the project, configured, not turned off, and its version
Get sprint
The project working sprint: header, revision and issues by role
Upload sprint draft
Write a sprint draft into the working slot entirely: header (status PLANNING) and issues by role. An occupied slot is not overwritten without "Overwrite". Role: editor.
+21 more actionsShow less actions
Update sprint header
Change the name, dates, goal, field values or role resources of the working sprint. Role: editor.
Create or update sprint item
Add an issue to a role or change its fields (the rest is kept). Role: editor.
Remove issue from sprint
Remove an issue from the role issue list. Role: editor.
Assign person to sprint item
Assign a person to a role issue and optionally the work dates; an empty login unassigns. Works once the role was sent for confirmation. Role: assigner.
Get many history records
Sprint snapshots by role: status, dates, who confirmed and finished, issue count
Get capacity
Sprint capacity record: participants with grade, rate, participation share and allocation across roles
Create or update capacity member
Add a participant to the sprint capacity or change their parameters. Without a sprint ID — the working slot sprint. Role: settings manager or planning manager.
Get calendar
The project production calendar by year
Get many absences
Employee absences: dates, type, hours per day
Create or update absence
Add an employee absence; a record with the same dates is replaced entirely. Role: settings manager or planning manager.
Delete absence
Delete an employee absence by login and dates. Role: settings manager or planning manager.
Get many releases
Project releases: status, dates, freeze, issue list, role representatives
Create or update release
Create a release or change an existing one by ID (the other fields are kept). Role: release manager.
Set release status
Move a release along the chain planned → prep → work → released; cancelled — cancellation. A release engineer — only to the next step. Role: release manager or release engineer.
Add and remove release issues
Add and/or remove release issues in one step. Role: release manager.
Delete release
Delete one release from the registry; irreversible. Requires planner 3.51.0 or later. Role: release manager.
Get many reminders
Active reminders for the token's user; the project journal — by option
Get my roles in project
The token user's roles by planner groups. Roles are membership in planner groups, not permission for an operation. Requires planner 3.51.0 or later.
Search issues
YouTrack issues by a query in the YouTrack search syntax
Set issue field
Write one issue field value through the standard YouTrack REST with the token user's permissions
Set issue field via planner
Write an issue field through the planner: only fields from the planner settings and only with a planner role (assigner, editor, settings manager, release manager or release engineer)
HOW IT WORKS
How to connect
Connect Smart Sprint Planner and Dokaai in a few steps.
STEP 01
Choose your apps
Open your n8n instance and add the Smart Sprint Planner and Dokaai nodes to a workflow.
STEP 02
Connect your accounts
Connect your accounts and choose an available trigger. Install any required community nodes if needed.
STEP 03
Set up your workflow
Choose a Dokaai action, map the required fields, and test your workflow.
Choose your apps
Open your n8n instance and add the Smart Sprint Planner and Dokaai nodes to a workflow.
Connect your accounts
Connect your accounts and choose an available trigger. Install any required community nodes if needed.
Set up your workflow
Choose a Dokaai action, map the required fields, and test your workflow.
Frequently asked questions
You can use available Smart Sprint Planner events to trigger supported Dokaai actions, such as sending notifications or managing customers. Available events and fields depend on the app.
n8n provides a visual workflow builder for supported triggers and actions. Some community nodes or advanced workflows may require extra configuration.
You need access to Smart Sprint Planner, Dokaai, and an n8n instance. Connect the required accounts and provide the fields for your workflow.
See the Smart Sprint Planner operations on n8n section above for available triggers, actions, and searches. Availability and required fields can depend on your account.
Costs depend on your Smart Sprint Planner, Dokaai, and n8n plans and the workflow you create. Check each provider's current pricing and plan limits.