Connect Smart Sprint Planner with Dokaai

Bring Smart Sprint Planner into your notification workflows.

Connect through n8n to use supported Dokaai actions alongside your existing tools.

Smart Sprint Planner logo
Dokaai logo

About Smart Sprint Planner

Sprint and role items, history, capacity, absences, releases and planner permissions through the YouTrack REST. Write to one project sequentially; re-read the data after a series of writes.

What you can automate

Use n8n to connect Smart Sprint Planner events to Dokaai actions. Available events and fields depend on the app.

Workflow ideas

Get project overview in Smart Sprint Planner Send a Dokaai notification

Choose a notification handler and map the required fields in n8n.

Get many projects in Smart Sprint Planner Send a Dokaai notification

Choose a notification handler and map the required fields in n8n.

Get planner status in project in Smart Sprint Planner Send a Dokaai notification

Choose a notification handler and map the required fields in n8n.

These are workflow ideas, not prebuilt templates. Required data and configuration vary by trigger.

Smart Sprint Planner operations on n8n

Explore the triggers, actions, and searches available for Smart Sprint Planner in n8n. Availability and required fields depend on your account.

Actions

26

Tasks your workflow can perform.

  • Get project overview

    Planner version, whether it is configured, active roles, the working sprint with issue counts per role, the sprint creation lock and the release count

  • Get many projects

    YouTrack projects visible to the token, marked with whether the planner is attached

  • Get planner status in project

    Whether the planner is attached to the project, configured, not turned off, and its version

  • Get sprint

    The project working sprint: header, revision and issues by role

  • Upload sprint draft

    Write a sprint draft into the working slot entirely: header (status PLANNING) and issues by role. An occupied slot is not overwritten without "Overwrite". Role: editor.

+21 more actions
  • Update sprint header

    Change the name, dates, goal, field values or role resources of the working sprint. Role: editor.

  • Create or update sprint item

    Add an issue to a role or change its fields (the rest is kept). Role: editor.

  • Remove issue from sprint

    Remove an issue from the role issue list. Role: editor.

  • Assign person to sprint item

    Assign a person to a role issue and optionally the work dates; an empty login unassigns. Works once the role was sent for confirmation. Role: assigner.

  • Get many history records

    Sprint snapshots by role: status, dates, who confirmed and finished, issue count

  • Get capacity

    Sprint capacity record: participants with grade, rate, participation share and allocation across roles

  • Create or update capacity member

    Add a participant to the sprint capacity or change their parameters. Without a sprint ID — the working slot sprint. Role: settings manager or planning manager.

  • Get calendar

    The project production calendar by year

  • Get many absences

    Employee absences: dates, type, hours per day

  • Create or update absence

    Add an employee absence; a record with the same dates is replaced entirely. Role: settings manager or planning manager.

  • Delete absence

    Delete an employee absence by login and dates. Role: settings manager or planning manager.

  • Get many releases

    Project releases: status, dates, freeze, issue list, role representatives

  • Create or update release

    Create a release or change an existing one by ID (the other fields are kept). Role: release manager.

  • Set release status

    Move a release along the chain planned → prep → work → released; cancelled — cancellation. A release engineer — only to the next step. Role: release manager or release engineer.

  • Add and remove release issues

    Add and/or remove release issues in one step. Role: release manager.

  • Delete release

    Delete one release from the registry; irreversible. Requires planner 3.51.0 or later. Role: release manager.

  • Get many reminders

    Active reminders for the token's user; the project journal — by option

  • Get my roles in project

    The token user's roles by planner groups. Roles are membership in planner groups, not permission for an operation. Requires planner 3.51.0 or later.

  • Search issues

    YouTrack issues by a query in the YouTrack search syntax

  • Set issue field

    Write one issue field value through the standard YouTrack REST with the token user's permissions

  • Set issue field via planner

    Write an issue field through the planner: only fields from the planner settings and only with a planner role (assigner, editor, settings manager, release manager or release engineer)

HOW IT WORKS

How to connect

Connect Smart Sprint Planner and Dokaai in a few steps.

Choose your apps

Open your n8n instance and add the Smart Sprint Planner and Dokaai nodes to a workflow.

Connect your accounts

Connect your accounts and choose an available trigger. Install any required community nodes if needed.

Set up your workflow

Choose a Dokaai action, map the required fields, and test your workflow.

Frequently asked questions